1-Day or 2-Evening Course on PPVC Lifting Course for Crane Operators
Overview
Recently construction sites had started using Prefabricated Prefinished Volumetric Construction (PPVC) in building construction to improve productivity. The components used in PPVC are much heavier and bulky. To lift such components using cranes, the crane operators need to handle the components (loads) more carefully and position them accurately at specified location points mostly with the help of signalmen’s walkie-talkie communications as the crane operators are unable to see the locations points due to large size of the PPVC components.
Objectives
At the end of the training, participants would be able to perform lifting operations with heavy and bulky loads, such as PPVC units, in a safe manner using the respective cranes (Crawler/Truck-mounted Mobile/Saddle-Jib tower crane).